Pure Color Knee-High PVC Boots for Women Waterproof Fishing Shoes Anti-Slipping Rainboots Ladies Wellington Boots
Sichuan Stars Fia Industry Co., Ltd.
Sichuan, China
Last Login Date:
Mar 03, 2025
Business Type:
Manufacturer/Factory, Trading Company
Main Products:
Helmet, Raincoat, Poncho, Motorcycle Awning, Motorcycle Canopy, Motorcycle Accessories, DOT /CE/ ECE/Helmet, Full Face Helmet, Retro Scooter Motorbike Moto Helmet, Half Face Helmet
Product Description
Company Info
Basic Info.
Product Description
Sample | Available |
Production time | 25-45 days based on order quantity |
Trade Term | EXW / FOB / CIF |
Sea Port | Shanghai Port |
Payment | 30% TT deposit, 70% against copy of B/L |
Accesories | Label, Hang tag and Gift box according to your requirement |
Imprint | customized print |
Transport Package | polybag |
Women
EU | 36 | 36.5 | 37 | 38 |
Length(mm) | 230 | 230 | 235 | 240 |
EU | 38.5 | 39 | 40 | 41 |
Length(mm) | 245 | 250 | 255 | 260 |
We are a professional Motorcycle Accessories industry company sited in Sichuan, which engaged in production, sales and trade 15 years. Our main products include raincoat, rain cap, rainboots, Motor Cycle Helmets, Half Face Motorcycle Helmet, Full Face Motorcycle Helmet,Motorcycle sun and rain shelter wind shield and so on.
It has more than 20 professional rainboots production lines, more than 500 professional production workers, and a monthly production capacity of up to 10000 pieces and the supply is stable.
With the business philosophy of "integrity, quality, service, and win-win", innovation and continuous improvement, we are committed to becoming the world′s leading manufacturer of shade covering materials.
1.What's your advantages?
OEM & ODM services can be provided. Professional on customized order!2.How do your packing of the goods? Do you offer customized packaging?
The standard export packing: opp polybag with per piece.
Of course also can packing as customer request, like gift box, lebals etc.
3.How does your factory control the quality?
I. We have strict quality control system from approval each material to finish.
II.Before production, a pre-production sample will be made for salesman to approve.
III.After goods finally packed in cartons, our QC inspect goods at randomly.
4.What is your best FOB price per unit when ordering 500, 1000 and 2000pcs?
Our MOQ is usually 300pcs (FOB SHANGHAI), favorable discount is negotiable for bigger qty.
5.What is your mass order delivery time?
The time of delivery is 35-50 days after order confirmed.
6.What is your payment terms?
We accept 30% T/T in advance, 70% before loading.
7.What format of the file do you need if I want my own design?
You can provide AI or PDF, we will make clear artwork for your final confirmation.